PROJECT

Total of 82 Locations,
372,708.3 kW All over Japan
Includes :
Photovoltaic Power Plants 77 locations 309,335.3kW
Biomass Power Plants 2 locations 40,918.0kW
Wind Power Plants 3 locations 22,455.0kW

※Under-construction projects included

Area

Fukuoka Nougata Project

Power Plant Location Nougata-shi, Fukuoka
Site Area 48,949㎡
Output 1,995.8kW
Work Completion Date September 2013

Nagasaki Minami Shimabara Project

Power Plant Location Minamishimabara-shi, Nagasaki
Site Area 28,521㎡
Output 1,100.0kW
Work Completion Date August 2014

Kumamoto Nishiki Project

Power Plant Location Kuma-gun, Kumamoto
Site Area 42,281㎡
Output 2,196.0kW
Work Completion Date February 2015

Kagoshima Ibusuki Project No. 1

Power Plant Location Ibusuki-shi, Kagoshima
Site Area 21,830㎡
Output 1,333.5kW
Work Completion Date March 2015

Kagoshima Ibusuki Project No. 2

Power Plant Location Ibusuki-shi, Kagoshima
Site Area 24,178㎡
Output 1,175.0kW
Work Completion Date March 2015

Kagoshima Ibusuki Project No. 3

Power Plant Location Ibusuki-shi, Kagoshima
Site Area 13,893㎡
Output 903.0kW
Work Completion Date March 2015

Kumamoto Tsunagi Project

Power Plant Location Ashikita-gun, Kumamoto
Site Area 34,482㎡
Output 1,544.0kW
Work Completion Date March 2015

Tochigi Nasu Takaku Project

Power Plant Location Nasu-gun, Tochigi
Site Area 9,778㎡
Output 857.5kW
Work Completion Date March 2015

Tochigi Nasu Toyohara Project

Power Plant Location Nasu-gun, Tochigi
Site Area 40,683㎡
Output 1,168.0kW
Work Completion Date March 2015

Tochigi Nasu Terako Project

Power Plant Location Nasu-gun, Tochigi
Site Area 39,496㎡
Output 2,401.0kW
Work Completion Date April 2015

Yamanashi Hokuto Project

Power Plant Location Hokuto-shi, Yamanashi
Site Area 17,832㎡
Output 848.0kW
Work Completion Date June 2015

Saitama Kounosu Project

Power Plant Location Kounosu-shi, Saitama
Site Area 21,213㎡
Output 1,938.4kW
Work Completion Date August 2015

Toyama Fuchu Project

Power Plant Location Toyama-shi, Toyama
Site Area 7,421㎡
Output 546.8kW
Work Completion Date August 2015

Niigata Shibata Project

Power Plant Location Shibata-shi, Niigata
Site Area 21,343㎡
Output 1,262.0kW
Work Completion Date August 2015

Fukuoka Keisen Project No.1

Power Plant Location Kaho-gun, Fukuoka
Site Area 37,290㎡
Output 2,002.8kW
Work Completion Date September 2015

Fukuoka keisen Project No.2

Power Plant Location Kaho-gun, Fukuoka
Site Area 27,540㎡
Output 2,003.0kW
Work Completion Date September 2015

Ibaraki Hitachiota Project

Power Plant Location Hitachiota-shi, Ibaraki
Site Area 9,768㎡
Output 461.2kW
Work Completion Date September 2015

Chiba Tateyama Project

Power Plant Location Tateyama-shi, Chiba
Site Area 7,483㎡
Output 546.8kW
Work Completion Date November 2015

Ibaraki Takahagi Project 1

Power Plant Location Takahagi-shi, Ibaraki
Site Area 38,119㎡
Output 1,813.5kW
Work Completion Date December 2015

Ibaraki Takahagi Project 2

Power Plant Location Takahagi-shi, Ibaraki
Site Area 43,336㎡
Output 2,313.0kW
Work Completion Date December 2015

Chiba Kisarazu Project

Power Plant Location Kisarazu-shi, Chiba
Site Area 15,780㎡
Output 546.8kW
Work Completion Date December 2015

Aomori Tsugaru Project

Power Plant Location Tsugaru-shi, Aomori
Site Area 62,049㎡
Output 2,446.0kW
Work Completion Date December 2015

Yamaguchi Hirao Project

Power Plant Location Kumage-gun, Ymaguchi
Site Area 14,425㎡
Output 1,048.3kW
Work Completion Date March 2016

Okayama Tsuyama Project

Power Plant Location Tsuyama-shi, Okayama
Site Area 2,774㎡
Output 301.9kW
Work Completion Date March 2016

Ibaraki Kamisu Project

Power Plant Location Kasumi-shi, Ibaraki
Site Area 2,553㎡
Output 217.2kW
Work Completion Date March 2016

Shizuoka Kosai Project No.1

Power Plant Location Kosai-shi, Shizuoka
Site Area 44,290㎡
Output 2,425.2kW
Work Completion Date March 2016

Shizuoka Kosai Project 2

Power Plant Location Kosai-shi, Shizuoka
Site Area 20,005㎡
Output 1,202.0kW
Work Completion Date March 2016

Saitama Honjo Project

Power Plant Location Honjo-shi, Saitama
Site Area 12,156㎡
Output 757.1kW
Work Completion Date March 2016

Tochigi Manako Project

Power Plant Location Tochigi-shi, Tochigi
Site Area 49,500㎡
Output 2,611.9kW
Work Completion Date March 2016

Fukushima Ten-ei Project

Power Plant Location Iwase-gun, Fukushima
Site Area 132,356㎡
Output 2,344.9kW
Work Completion Date August 2016

Ibaraki Kashima Project

Power Plant Location Kashima-shi, Ibaraki
Site Area 26,449㎡
Output 2,013.4kW
Work Completion Date September 2016

Ibaraki Namegata Project 2

Power Plant Location Namegata-shi, Ibaraki
Site Area 54,618㎡
Output 2,401.4kW
Work Completion Date September 2016

Ibaraki Takahagi Project 3

Power Plant Location Takahagi-shi, Ibaraki
Site Area 14,874㎡
Output 603.2kW
Work Completion Date September 2016

Yamagata Yuza Project

Power Plant Location Akumi-gun, Yamagata
Site Area 40,547㎡
Output 2,168.7kW
Work Completion Date September 2016

Ibaraki Kitasouma Project No.1

Power Plant Location Kitasouma-gun, Ibaraki
Site Area 37,611㎡
Output 1,785.0kW
Work Completion Date November 2016

Ibaraki Kitasouma Project No.2

Power Plant Location Kitasouma-gun, Ibaraki
Site Area 42,032㎡
Output 1,785.0kW
Work Completion Date November 2016

Hyogo Himeji Yumesaki Project

Power Plant Location Himeji-shi, Hyogo
Site Area 30,743㎡
Output 2,802.8kW
Work Completion Date December 2016

Chiba Sammu Project

Power Plant Location Sammu-shi, Chiba
Site Area 43,414㎡
Output 2,012.8kW
Work Completion Date December 2016

Ishikawa Houdatsu Shimizu Project

Power Plant Location Hakui-gun Ishikawa
Site Area 264,924㎡
Output 16,086.7kW
Work Completion Date February 2017

Oita Shuki Project

Power Plant Location Oita-shi, Oita
Site Area 81,194㎡
Output 1,424.6kW
Work Completion Date March 2017

Tottori Daisen Project

Power Plant Location Saihaku-gun, Tottori
Site Area 10,903㎡
Output 549.1kW
Work Completion Date March 2017

Hyogo Toyooka Project

Power Plant Location Toyooka-shi, Hyogo
Site Area 76,430㎡
Output 2,601.9kW
Work Completion Date March 2017

Ibaraki Takahagi Chiushida Project

Power Plant Location Takahagi-shi, Ibaraki
Site Area 47,158㎡
Output 2,403.4kW
Work Completion Date March 2017

Ibaraki Namegata Project 1

Power Plant Location Namegata-shi, Ibaraki
Site Area 36,684㎡
Output 2,801.7kW
Work Completion Date March 2017

Ibaraki Hokota Project

Power Plant Location Hokota-shi, Ibaraki
Site Area 12,955㎡
Output 1,239.9kW
Work Completion Date March 2017

Ibaraki Namegata Yukudo Project

Power Plant Location Namegata-shi, Ibaraki
Site Area 29,539㎡
Output 2,090.8kW
Work Completion Date March 2017

Aichi Nishio Project

Power Plant Location Nishio-shi, Aichi
Site Area 8,024㎡
Output 764.4kW
Work Completion Date March 2017

Nagano Shiojiri Project

Power Plant Location Shiojiri-shi, Nagano
Site Area 7,084㎡
Output 701.7kW
Work Completion Date March 2017

Miyagi Kami Project

Power Plant Location Kamigun, Miyagi
Site Area 18,501㎡
Output 1,203.1kW
Work Completion Date March 2017

Mie Tsu Project

Power Plant Location Tsu-shi, Mie
Site Area 36,679㎡
Output 2,475.3kW
Work Completion Date February 2018

Aichi Mihama Project

Power Plant Location Chita-gun, Aichi
Site Area 16,664㎡
Output 781.9kW
Work Completion Date February 2018

Fukushima Koriyama Project

Power Plant Location Koriyama-shi, Fukushima
Site Area 41,853㎡
Output 1,474.2kW
Work Completion Date February 2018

Ibaraki Kamiota Project

Power Plant Location Hokota-shi, Ibaraki
Site Area 33,998㎡
Output 2,404.0kW
Work Completion Date March 2018

Nagano Old Shiojiri Project

Power Plant Location Shiojiri-shi, Nagano
Site Area 58,431㎡
Output 2,235.6kW
Work Completion Date March 2018

Yamaguchi Shimonoseki Project 1

Power Plant Location Shimonoseki-shi, Yamaguchi
Site Area 61,815㎡
Output 3,022.9kW
Work Completion Date March 2018

Yamaguchi Shimonoseki Project 2

Power Plant Location Shimonoseki-shi, Yamaguchi
Site Area 24,755㎡
Output 1,248.0kW
Work Completion Date March 2018

Chiba Kibara Project

Power Plant Location Sammu-shi, Chiba
Site Area 45,142㎡
Output 1,128.9kW
Work Completion Date August 2018

Okayama Hirayama Project

Power Plant Location Okayama-shi, Okayama
Site Area 19,387㎡
Output 1,104.0kW
Work Completion Date September 2018

Ibaraki Myoga Project

Power Plant Location Kuji-gun, Ibaraki
Site Area 44,057㎡
Output 1,469.6kW
Work Completion Date November 2018

Hokkaido Hidaka Project

Power Plant Location Saru-gun, Hokkaido
Site Area 46,000㎡
Output 2,666.4kW
Work Completion Date January 2019

Wakayama Kushimoto Project

Power Plant Location Higashimuro-gun, Wakayama
Site Area 33,825㎡
Output 2,710.4kW
Work Completion Date March 2019

Kumamoto Aso Project

Power Plant Location Aso-shi, Kumamoto
Site Area 24,766㎡
Output 1,193.5kW
Work Completion Date March 2019

Hyogo Izushi Project

Power Plant Location Toyoka-shi, Hyogo
Site Area 21,268㎡
Output 1,500.8kW
Work Completion Date May 2019

Iwate Ichinoseki Project【Under Construction】

Power Plant Location Ichinoseki-shi, Iwate
Site Area 307,212㎡
Output 12,010.0kW
Work Completion Date Scheduled for August 2019

Nara Nakahata Project 1【Under Construction】

Power Plant Location Nara-shi, Nara
Site Area 47,969㎡
Output 2,971.8kW
Work Completion Date Scheduled for August 2019

Nara Nakahata Project 2【Under Construction】

Power Plant Location Nara-shi, Nara
Site Area 16,404㎡
Output 1,123.2kW
Work Completion Date Scheduled for August 2019

Hiroshima Akitakata Project【Under Construction】

Power Plant Location Akitakata-shi, Hiroshima
Site Area 27,461㎡
Output 1,673.6kW
Work Completion Date Scheduled for September 2019

Nagasaki Ikeda Project【Under Construction】

Power Plant Location Omura-shi, Nagasaki
Site Area 25,828㎡
Output 1,908.9kW
Work Completion Date Scheduled for November 2019

Nagasaki Masuragahara Project【Under Construction】

Power Plant Location Omura-shi, Nagasaki
Site Area 24,149㎡
Output 1,273.8kW
Work Completion Date Scheduled for November 2019

Ibaraki Kunikihara Project【Under Construction】

Power Plant Location Hitachi-shi, Ibaraki
Site Area 362,591㎡
Output 16,013.3kW
Work Completion Date Scheduled for December 2019

Nagasaki Sasebo Project【Under Construction】

Power Plant Location Sasebo-shi, Nagasaki
Site Area 62,604㎡
Output 2,124.8kW
Work Completion Date Scheduled for December 2019

Chiba Kimitsu Project【Under Construction】

Power Plant Location Kimitsu-shi, Chiba
Site Area 506,116㎡
Output 36,131.7kW
Work Completion Date Scheduled for February 2020

Chiba Mobara Project【Under Construction】

Power Plant Location Mobara-shi, Chiba
Site Area 432,776㎡
Output 24,011.4kW
Work Completion Date Scheduled for February 2020

Ibaraki Kamisu Biomass Project 1【In Preparation】

Power Plant Location kamisu-shi, Ibaraki
Site Area 20,000㎡
Output 22,100.0kW
Work Completion Date Scheduled for March 2020

Ibaraki Kamisu Biomass Project 2【In Preparation】

Power Plant Location kamisu-shi, Ibaraki
Site Area 9,955㎡
Output 18,818.0kW
Work Completion Date Scheduled for March 2020

Ishikawa Momoura Akasumi Project【In Preparation】

Power Plant Location Hakui-gun, Ishikawa
Site Area 65,492㎡
Output 7,485.0kW
Work Completion Date Scheduled for December 2020

Ishikawa Yada Project【In Preparation】

Power Plant Location Hakui-gun, Ishikawa
Site Area 40,111㎡
Output 7,485.0kW
Work Completion Date Scheduled for December 2020

Ishikawa Monzen Project【In Preparation】

Power Plant Location Hakui-gun, Ishikawa
Site Area 7,448㎡
Output 7,485.0kW
Work Completion Date Scheduled for December 2020

Oita Usa Project【In Preparation】

Power Plant Location Usa-shi, Oita
Site Area 235,929㎡
Output 10,345.6kW
Work Completion Date Scheduled for March 2021

Ehime Imabari Project【In Preparation】

Power Plant Location Imabari-shi, Ehime
Site Area 230,990㎡
Output 10,006.1kW
Work Completion Date Scheduled for September 2021

Miyagi Marumori Project【In Preparation】

Power Plant Location Igu-gun, Miyagi
Site Area 575,135㎡
Output 28,299.2kW
Work Completion Date Scheduled for April 2022

Fukushima Azuma Project【In Preparation】

Power Plant Location Fukushima-shi, Fukushima
Site Area 655,738㎡
Output 46,276.2kW
Work Completion Date Scheduled for December 2022

Fukuoka Nougata Project

Power Plant Location Nougata-shi, Fukuoka
Site Area 48,949㎡
Output 1,995.8kW
Work Completion Date September 2013

Nagasaki Minami Shimabara Project

Power Plant Location Minamishimabara-shi, Nagasaki
Site Area 28,521㎡
Output 1,100.0kW
Work Completion Date August 2014

Kumamoto Nishiki Project

Power Plant Location Kuma-gun, Kumamoto
Site Area 42,281㎡
Output 2,196.0kW
Work Completion Date February 2015

Kagoshima Ibusuki Project No. 1

Power Plant Location Ibusuki-shi, Kagoshima
Site Area 21,830㎡
Output 1,333.5kW
Work Completion Date March 2015

Kagoshima Ibusuki Project No. 2

Power Plant Location Ibusuki-shi, Kagoshima
Site Area 24,178㎡
Output 1,175.0kW
Work Completion Date March 2015

Kagoshima Ibusuki Project No. 3

Power Plant Location Ibusuki-shi, Kagoshima
Site Area 13,893㎡
Output 903.0kW
Work Completion Date March 2015

Kumamoto Tsunagi Project

Power Plant Location Ashikita-gun, Kumamoto
Site Area 34,482㎡
Output 1,544.0kW
Work Completion Date March 2015

Tochigi Nasu Takaku Project

Power Plant Location Nasu-gun, Tochigi
Site Area 9,778㎡
Output 857.5kW
Work Completion Date March 2015

Tochigi Nasu Toyohara Project

Power Plant Location Nasu-gun, Tochigi
Site Area 40,683㎡
Output 1,168.0kW
Work Completion Date March 2015

Tochigi Nasu Terako Project

Power Plant Location Nasu-gun, Tochigi
Site Area 39,496㎡
Output 2,401.0kW
Work Completion Date April 2015

Yamanashi Hokuto Project

Power Plant Location Hokuto-shi, Yamanashi
Site Area 17,832㎡
Output 848.0kW
Work Completion Date June 2015

Saitama Kounosu Project

Power Plant Location Kounosu-shi, Saitama
Site Area 21,213㎡
Output 1,938.4kW
Work Completion Date August 2015

Toyama Fuchu Project

Power Plant Location Toyama-shi, Toyama
Site Area 7,421㎡
Output 546.8kW
Work Completion Date August 2015

Niigata Shibata Project

Power Plant Location Shibata-shi, Niigata
Site Area 21,343㎡
Output 1,262.0kW
Work Completion Date August 2015

Fukuoka Keisen Project No.1

Power Plant Location Kaho-gun, Fukuoka
Site Area 37,290㎡
Output 2,002.8kW
Work Completion Date September 2015

Fukuoka keisen Project No.2

Power Plant Location Kaho-gun, Fukuoka
Site Area 27,540㎡
Output 2,003.0kW
Work Completion Date September 2015

Ibaraki Hitachiota Project

Power Plant Location Hitachiota-shi, Ibaraki
Site Area 9,768㎡
Output 461.2kW
Work Completion Date September 2015

Chiba Tateyama Project

Power Plant Location Tateyama-shi, Chiba
Site Area 7,483㎡
Output 546.8kW
Work Completion Date November 2015

Ibaraki Takahagi Project 1

Power Plant Location Takahagi-shi, Ibaraki
Site Area 38,119㎡
Output 1,813.5kW
Work Completion Date December 2015

Ibaraki Takahagi Project 2

Power Plant Location Takahagi-shi, Ibaraki
Site Area 43,336㎡
Output 2,313.0kW
Work Completion Date December 2015

Chiba Kisarazu Project

Power Plant Location Kisarazu-shi, Chiba
Site Area 15,780㎡
Output 546.8kW
Work Completion Date December 2015

Aomori Tsugaru Project

Power Plant Location Tsugaru-shi, Aomori
Site Area 62,049㎡
Output 2,446.0kW
Work Completion Date December 2015

Yamaguchi Hirao Project

Power Plant Location Kumage-gun, Ymaguchi
Site Area 14,425㎡
Output 1,048.3kW
Work Completion Date March 2016

Okayama Tsuyama Project

Power Plant Location Tsuyama-shi, Okayama
Site Area 2,774㎡
Output 301.9kW
Work Completion Date March 2016

Ibaraki Kamisu Project

Power Plant Location Kasumi-shi, Ibaraki
Site Area 2,553㎡
Output 217.2kW
Work Completion Date March 2016

Shizuoka Kosai Project No.1

Power Plant Location Kosai-shi, Shizuoka
Site Area 44,290㎡
Output 2,425.2kW
Work Completion Date March 2016

Shizuoka Kosai Project 2

Power Plant Location Kosai-shi, Shizuoka
Site Area 20,005㎡
Output 1,202.0kW
Work Completion Date March 2016

Saitama Honjo Project

Power Plant Location Honjo-shi, Saitama
Site Area 12,156㎡
Output 757.1kW
Work Completion Date March 2016

Tochigi Manako Project

Power Plant Location Tochigi-shi, Tochigi
Site Area 49,500㎡
Output 2,611.9kW
Work Completion Date March 2016

Fukushima Ten-ei Project

Power Plant Location Iwase-gun, Fukushima
Site Area 132,356㎡
Output 2,344.9kW
Work Completion Date August 2016

Ibaraki Kashima Project

Power Plant Location Kashima-shi, Ibaraki
Site Area 26,449㎡
Output 2,013.4kW
Work Completion Date September 2016

Ibaraki Namegata Project 2

Power Plant Location Namegata-shi, Ibaraki
Site Area 54,618㎡
Output 2,401.4kW
Work Completion Date September 2016

Ibaraki Takahagi Project 3

Power Plant Location Takahagi-shi, Ibaraki
Site Area 14,874㎡
Output 603.2kW
Work Completion Date September 2016

Yamagata Yuza Project

Power Plant Location Akumi-gun, Yamagata
Site Area 40,547㎡
Output 2,168.7kW
Work Completion Date September 2016

Ibaraki Kitasouma Project No.1

Power Plant Location Kitasouma-gun, Ibaraki
Site Area 37,611㎡
Output 1,785.0kW
Work Completion Date November 2016

Ibaraki Kitasouma Project No.2

Power Plant Location Kitasouma-gun, Ibaraki
Site Area 42,032㎡
Output 1,785.0kW
Work Completion Date November 2016

Hyogo Himeji Yumesaki Project

Power Plant Location Himeji-shi, Hyogo
Site Area 30,743㎡
Output 2,802.8kW
Work Completion Date December 2016

Chiba Sammu Project

Power Plant Location Sammu-shi, Chiba
Site Area 43,414㎡
Output 2,012.8kW
Work Completion Date December 2016

Ishikawa Houdatsu Shimizu Project

Power Plant Location Hakui-gun Ishikawa
Site Area 264,924㎡
Output 16,086.7kW
Work Completion Date February 2017

Oita Shuki Project

Power Plant Location Oita-shi, Oita
Site Area 81,194㎡
Output 1,424.6kW
Work Completion Date March 2017

Tottori Daisen Project

Power Plant Location Saihaku-gun, Tottori
Site Area 10,903㎡
Output 549.1kW
Work Completion Date March 2017

Hyogo Toyooka Project

Power Plant Location Toyooka-shi, Hyogo
Site Area 76,430㎡
Output 2,601.9kW
Work Completion Date March 2017

Ibaraki Takahagi Chiushida Project

Power Plant Location Takahagi-shi, Ibaraki
Site Area 47,158㎡
Output 2,403.4kW
Work Completion Date March 2017

Ibaraki Namegata Project 1

Power Plant Location Namegata-shi, Ibaraki
Site Area 36,684㎡
Output 2,801.7kW
Work Completion Date March 2017

Ibaraki Hokota Project

Power Plant Location Hokota-shi, Ibaraki
Site Area 12,955㎡
Output 1,239.9kW
Work Completion Date March 2017

Ibaraki Namegata Yukudo Project

Power Plant Location Namegata-shi, Ibaraki
Site Area 29,539㎡
Output 2,090.8kW
Work Completion Date March 2017

Aichi Nishio Project

Power Plant Location Nishio-shi, Aichi
Site Area 8,024㎡
Output 764.4kW
Work Completion Date March 2017

Nagano Shiojiri Project

Power Plant Location Shiojiri-shi, Nagano
Site Area 7,084㎡
Output 701.7kW
Work Completion Date March 2017

Miyagi Kami Project

Power Plant Location Kamigun, Miyagi
Site Area 18,501㎡
Output 1,203.1kW
Work Completion Date March 2017

Mie Tsu Project

Power Plant Location Tsu-shi, Mie
Site Area 36,679㎡
Output 2,475.3kW
Work Completion Date February 2018

Aichi Mihama Project

Power Plant Location Chita-gun, Aichi
Site Area 16,664㎡
Output 781.9kW
Work Completion Date February 2018

Fukushima Koriyama Project

Power Plant Location Koriyama-shi, Fukushima
Site Area 41,853㎡
Output 1,474.2kW
Work Completion Date February 2018

Ibaraki Kamiota Project

Power Plant Location Hokota-shi, Ibaraki
Site Area 33,998㎡
Output 2,404.0kW
Work Completion Date March 2018

Nagano Old Shiojiri Project

Power Plant Location Shiojiri-shi, Nagano
Site Area 58,431㎡
Output 2,235.6kW
Work Completion Date March 2018

Yamaguchi Shimonoseki Project 1

Power Plant Location Shimonoseki-shi, Yamaguchi
Site Area 61,815㎡
Output 3,022.9kW
Work Completion Date March 2018

Yamaguchi Shimonoseki Project 2

Power Plant Location Shimonoseki-shi, Yamaguchi
Site Area 24,755㎡
Output 1,248.0kW
Work Completion Date March 2018

Chiba Kibara Project

Power Plant Location Sammu-shi, Chiba
Site Area 45,142㎡
Output 1,128.9kW
Work Completion Date August 2018

Okayama Hirayama Project

Power Plant Location Okayama-shi, Okayama
Site Area 19,387㎡
Output 1,104.0kW
Work Completion Date September 2018

Ibaraki Myoga Project

Power Plant Location Kuji-gun, Ibaraki
Site Area 44,057㎡
Output 1,469.6kW
Work Completion Date November 2018

Hokkaido Hidaka Project

Power Plant Location Saru-gun, Hokkaido
Site Area 46,000㎡
Output 2,666.4kW
Work Completion Date January 2019

Wakayama Kushimoto Project

Power Plant Location Higashimuro-gun, Wakayama
Site Area 33,825㎡
Output 2,710.4kW
Work Completion Date March 2019

Kumamoto Aso Project

Power Plant Location Aso-shi, Kumamoto
Site Area 24,766㎡
Output 1,193.5kW
Work Completion Date March 2019

Hyogo Izushi Project

Power Plant Location Toyoka-shi, Hyogo
Site Area 21,268㎡
Output 1,500.8kW
Work Completion Date May 2019

Iwate Ichinoseki Project【Under Construction】

Power Plant Location Ichinoseki-shi, Iwate
Site Area 307,212㎡
Output 12,010.0kW
Work Completion Date Scheduled for August 2019

Nara Nakahata Project 1【Under Construction】

Power Plant Location Nara-shi, Nara
Site Area 47,969㎡
Output 2,971.8kW
Work Completion Date Scheduled for August 2019

Nara Nakahata Project 2【Under Construction】

Power Plant Location Nara-shi, Nara
Site Area 16,404㎡
Output 1,123.2kW
Work Completion Date Scheduled for August 2019

Hiroshima Akitakata Project【Under Construction】

Power Plant Location Akitakata-shi, Hiroshima
Site Area 27,461㎡
Output 1,673.6kW
Work Completion Date Scheduled for September 2019

Nagasaki Ikeda Project【Under Construction】

Power Plant Location Omura-shi, Nagasaki
Site Area 25,828㎡
Output 1,908.9kW
Work Completion Date Scheduled for November 2019

Nagasaki Masuragahara Project【Under Construction】

Power Plant Location Omura-shi, Nagasaki
Site Area 24,149㎡
Output 1,273.8kW
Work Completion Date Scheduled for November 2019

Ibaraki Kunikihara Project【Under Construction】

Power Plant Location Hitachi-shi, Ibaraki
Site Area 362,591㎡
Output 16,013.3kW
Work Completion Date Scheduled for December 2019

Nagasaki Sasebo Project【Under Construction】

Power Plant Location Sasebo-shi, Nagasaki
Site Area 62,604㎡
Output 2,124.8kW
Work Completion Date Scheduled for December 2019

Chiba Kimitsu Project【Under Construction】

Power Plant Location Kimitsu-shi, Chiba
Site Area 506,116㎡
Output 36,131.7kW
Work Completion Date Scheduled for February 2020

Chiba Mobara Project【Under Construction】

Power Plant Location Mobara-shi, Chiba
Site Area 432,776㎡
Output 24,011.4kW
Work Completion Date Scheduled for February 2020

Oita Usa Project【In Preparation】

Power Plant Location Usa-shi, Oita
Site Area 235,929㎡
Output 10,345.6kW
Work Completion Date Scheduled for March 2021

Ehime Imabari Project【In Preparation】

Power Plant Location Imabari-shi, Ehime
Site Area 230,990㎡
Output 10,006.1kW
Work Completion Date Scheduled for September 2021

Miyagi Marumori Project【In Preparation】

Power Plant Location Igu-gun, Miyagi
Site Area 575,135㎡
Output 28,299.2kW
Work Completion Date Scheduled for April 2022

Fukushima Azuma Project【In Preparation】

Power Plant Location Fukushima-shi, Fukushima
Site Area 655,738㎡
Output 46,276.2kW
Work Completion Date Scheduled for December 2022

Ibaraki Kamisu Biomass Project 1【In Preparation】

Power Plant Location kamisu-shi, Ibaraki
Site Area 20,000㎡
Output 22,100.0kW
Work Completion Date Scheduled for March 2020

Ibaraki Kamisu Biomass Project 2【In Preparation】

Power Plant Location kamisu-shi, Ibaraki
Site Area 9,955㎡
Output 18,818.0kW
Work Completion Date Scheduled for March 2020

Ishikawa Momoura Akasumi Project【In Preparation】

Power Plant Location Hakui-gun, Ishikawa
Site Area 65,492㎡
Output 7,485.0kW
Work Completion Date Scheduled for December 2020

Ishikawa Yada Project【In Preparation】

Power Plant Location Hakui-gun, Ishikawa
Site Area 40,111㎡
Output 7,485.0kW
Work Completion Date Scheduled for December 2020

Ishikawa Monzen Project【In Preparation】

Power Plant Location Hakui-gun, Ishikawa
Site Area 7,448㎡
Output 7,485.0kW
Work Completion Date Scheduled for December 2020