Fukuoka Nougata Project
Power Plant Location | Nougata-shi, Fukuoka |
---|---|
Site Area | 48,949㎡ |
Output | 2.0MW |
Work Completion Date | September 2013 |
※1 Under-construction projects included
※2 The number is the value for the entire group
Area
Power Plant Location | Nougata-shi, Fukuoka |
---|---|
Site Area | 48,949㎡ |
Output | 2.0MW |
Work Completion Date | September 2013 |
Power Plant Location | Minamishimabara-shi, Nagasaki |
---|---|
Site Area | 28,521㎡ |
Output | 1.1MW |
Work Completion Date | August 2014 |
Power Plant Location | Kuma-gun, Kumamoto |
---|---|
Site Area | 42,281㎡ |
Output | 2.2MW |
Work Completion Date | February 2015 |
Power Plant Location | Ibusuki-shi, Kagoshima |
---|---|
Site Area | 21,830㎡ |
Output | 1.3MW |
Work Completion Date | March 2015 |
Power Plant Location | Ibusuki-shi, Kagoshima |
---|---|
Site Area | 24,178㎡ |
Output | 1.2MW |
Work Completion Date | March 2015 |
Power Plant Location | Ibusuki-shi, Kagoshima |
---|---|
Site Area | 13,893㎡ |
Output | 0.9MW |
Work Completion Date | March 2015 |
Power Plant Location | Ashikita-gun, Kumamoto |
---|---|
Site Area | 34,482㎡ |
Output | 1.5MW |
Work Completion Date | March 2015 |
Power Plant Location | Nasu-gun, Tochigi |
---|---|
Site Area | 9,778㎡ |
Output | 0.9MW |
Work Completion Date | March 2015 |
Power Plant Location | Nasu-gun, Tochigi |
---|---|
Site Area | 40,683㎡ |
Output | 1.2MW |
Work Completion Date | March 2015 |
Power Plant Location | Nasu-gun, Tochigi |
---|---|
Site Area | 39,496㎡ |
Output | 2.4MW |
Work Completion Date | April 2015 |
Power Plant Location | Hokuto-shi, Yamanashi |
---|---|
Site Area | 17,832㎡ |
Output | 0.8MW |
Work Completion Date | June 2015 |
Power Plant Location | Kounosu-shi, Saitama |
---|---|
Site Area | 21,213㎡ |
Output | 1.9MW |
Work Completion Date | August 2015 |
Power Plant Location | Toyama-shi, Toyama |
---|---|
Site Area | 7,421㎡ |
Output | 0.5MW |
Work Completion Date | August 2015 |
Power Plant Location | Shibata-shi, Niigata |
---|---|
Site Area | 21,343㎡ |
Output | 1.3MW |
Work Completion Date | August 2015 |
Power Plant Location | Kaho-gun, Fukuoka |
---|---|
Site Area | 37,290㎡ |
Output | 2.0MW |
Work Completion Date | September 2015 |
Power Plant Location | Kaho-gun, Fukuoka |
---|---|
Site Area | 27,540㎡ |
Output | 2.0MW |
Work Completion Date | September 2015 |
Power Plant Location | Hitachiota-shi, Ibaraki |
---|---|
Site Area | 9,768㎡ |
Output | 0.5MW |
Work Completion Date | September 2015 |
Power Plant Location | Tateyama-shi, Chiba |
---|---|
Site Area | 7,483㎡ |
Output | 0.5MW |
Work Completion Date | November 2015 |
Power Plant Location | Takahagi-shi, Ibaraki |
---|---|
Site Area | 38,119㎡ |
Output | 1.8MW |
Work Completion Date | December 2015 |
Power Plant Location | Takahagi-shi, Ibaraki |
---|---|
Site Area | 43,336㎡ |
Output | 2.3MW |
Work Completion Date | December 2015 |
Power Plant Location | Kisarazu-shi, Chiba |
---|---|
Site Area | 15,780㎡ |
Output | 0.5MW |
Work Completion Date | December 2015 |
Power Plant Location | Tsugaru-shi, Aomori |
---|---|
Site Area | 62,049㎡ |
Output | 2.4MW |
Work Completion Date | December 2015 |
Power Plant Location | Kumage-gun, Yamaguchi |
---|---|
Site Area | 14,425㎡ |
Output | 1.0MW |
Work Completion Date | March 2016 |
Power Plant Location | Tsuyama-shi, Okayama |
---|---|
Site Area | 2,774㎡ |
Output | 0.3MW |
Work Completion Date | March 2016 |
Power Plant Location | Kasumi-shi, Ibaraki |
---|---|
Site Area | 2,553㎡ |
Output | 0.2MW |
Work Completion Date | March 2016 |
Power Plant Location | Kosai-shi, Shizuoka |
---|---|
Site Area | 44,290㎡ |
Output | 2.4MW |
Work Completion Date | March 2016 |
Power Plant Location | Kosai-shi, Shizuoka |
---|---|
Site Area | 20,005㎡ |
Output | 1.2MW |
Work Completion Date | March 2016 |
Power Plant Location | Honjo-shi, Saitama |
---|---|
Site Area | 12,156㎡ |
Output | 0.8MW |
Work Completion Date | March 2016 |
Power Plant Location | Tochigi-shi, Tochigi |
---|---|
Site Area | 49,500㎡ |
Output | 2.6MW |
Work Completion Date | March 2016 |
Power Plant Location | Iwase-gun, Fukushima |
---|---|
Site Area | 132,356㎡ |
Output | 2.3MW |
Work Completion Date | August 2016 |
Power Plant Location | Kashima-shi, Ibaraki |
---|---|
Site Area | 26,449㎡ |
Output | 2.0MW |
Work Completion Date | September 2016 |
Power Plant Location | Namegata-shi, Ibaraki |
---|---|
Site Area | 54,618㎡ |
Output | 2.4MW |
Work Completion Date | September 2016 |
Power Plant Location | Takahagi-shi, Ibaraki |
---|---|
Site Area | 14,874㎡ |
Output | 0.6MW |
Work Completion Date | September 2016 |
Power Plant Location | Akumi-gun, Yamagata |
---|---|
Site Area | 40,547㎡ |
Output | 2.2MW |
Work Completion Date | September 2016 |
Power Plant Location | Kitasouma-gun, Ibaraki |
---|---|
Site Area | 37,611㎡ |
Output | 1.8MW |
Work Completion Date | November 2016 |
Power Plant Location | Kitasouma-gun, Ibaraki |
---|---|
Site Area | 42,032㎡ |
Output | 1.8MW |
Work Completion Date | November 2016 |
Power Plant Location | Himeji-shi, Hyogo |
---|---|
Site Area | 30,743㎡ |
Output | 2.8MW |
Work Completion Date | December 2016 |
Power Plant Location | Sammu-shi, Chiba |
---|---|
Site Area | 43,414㎡ |
Output | 2.0MW |
Work Completion Date | December 2016 |
Power Plant Location | Hakui-gun, Ishikawa |
---|---|
Site Area | 264,924㎡ |
Output | 16.1MW |
Work Completion Date | February 2017 |
Power Plant Location | Oita-shi, Oita |
---|---|
Site Area | 81,194㎡ |
Output | 1.4MW |
Work Completion Date | March 2017 |
Power Plant Location | Saihaku-gun, Tottori |
---|---|
Site Area | 10,903㎡ |
Output | 0.5MW |
Work Completion Date | March 2017 |
Power Plant Location | Toyooka-shi, Hyogo |
---|---|
Site Area | 76,430㎡ |
Output | 2.6MW |
Work Completion Date | March 2017 |
Power Plant Location | Takahagi-shi, Ibaraki |
---|---|
Site Area | 47,158㎡ |
Output | 2.4MW |
Work Completion Date | March 2017 |
Power Plant Location | Namegata-shi, Ibaraki |
---|---|
Site Area | 36,684㎡ |
Output | 2.8MW |
Work Completion Date | March 2017 |
Power Plant Location | Hokota-shi, Ibaraki |
---|---|
Site Area | 12,955㎡ |
Output | 1.2MW |
Work Completion Date | March 2017 |
Power Plant Location | Namegata-shi, Ibaraki |
---|---|
Site Area | 29,539㎡ |
Output | 2.1MW |
Work Completion Date | March 2017 |
Power Plant Location | Nishio-shi, Aichi |
---|---|
Site Area | 8,024㎡ |
Output | 0.8MW |
Work Completion Date | March 2017 |
Power Plant Location | Shiojiri-shi, Nagano |
---|---|
Site Area | 7,084㎡ |
Output | 0.7MW |
Work Completion Date | March 2017 |
Power Plant Location | Kami-gun, Miyagi |
---|---|
Site Area | 18,501㎡ |
Output | 1.2MW |
Work Completion Date | March 2017 |
Power Plant Location | Tsu-shi, Mie |
---|---|
Site Area | 36,679㎡ |
Output | 2.5MW |
Work Completion Date | February 2018 |
Power Plant Location | Chita-gun, Aichi |
---|---|
Site Area | 16,664㎡ |
Output | 0.8MW |
Work Completion Date | February 2018 |
Power Plant Location | Koriyama-shi, Fukushima |
---|---|
Site Area | 41,853㎡ |
Output | 1.5MW |
Work Completion Date | February 2018 |
Power Plant Location | Hokota-shi, Ibaraki |
---|---|
Site Area | 33,998㎡ |
Output | 2.4MW |
Work Completion Date | March 2018 |
Power Plant Location | Shiojiri-shi, Nagano |
---|---|
Site Area | 58,431㎡ |
Output | 2.2MW |
Work Completion Date | March 2018 |
Power Plant Location | Shimonoseki-shi, Yamaguchi |
---|---|
Site Area | 61,815㎡ |
Output | 3.0MW |
Work Completion Date | March 2018 |
Power Plant Location | Shimonoseki-shi, Yamaguchi |
---|---|
Site Area | 24,755㎡ |
Output | 1.2MW |
Work Completion Date | March 2018 |
Power Plant Location | Sammu-shi, Chiba |
---|---|
Site Area | 45,142㎡ |
Output | 1.1MW |
Work Completion Date | August 2018 |
Power Plant Location | Okayama-shi, Okayama |
---|---|
Site Area | 19,387㎡ |
Output | 1.1MW |
Work Completion Date | September 2018 |
Power Plant Location | Kuji-gun, Ibaraki |
---|---|
Site Area | 44,057㎡ |
Output | 1.5MW |
Work Completion Date | November 2018 |
Power Plant Location | Saru-gun, Hokkaido |
---|---|
Site Area | 46,000㎡ |
Output | 2.7MW |
Work Completion Date | January 2019 |
Power Plant Location | Higashimuro-gun, Wakayama |
---|---|
Site Area | 33,825㎡ |
Output | 2.7MW |
Work Completion Date | March 2019 |
Power Plant Location | Aso-shi, Kumamoto |
---|---|
Site Area | 24,766㎡ |
Output | 1.2MW |
Work Completion Date | March 2019 |
Power Plant Location | Toyooka-shi, Hyogo |
---|---|
Site Area | 21,268㎡ |
Output | 1.5MW |
Work Completion Date | May 2019 |
Power Plant Location | Ichinoseki-shi, Iwate |
---|---|
Site Area | 307,212㎡ |
Output | 12.0MW |
Work Completion Date | August 2019 |
Power Plant Location | Nara-shi, Nara |
---|---|
Site Area | 47,969㎡ |
Output | 3.0MW |
Work Completion Date | September 2019 |
Power Plant Location | Nara-shi, Nara |
---|---|
Site Area | 16,404㎡ |
Output | 1.1MW |
Work Completion Date | October 2019 |
Power Plant Location | Akitakata-shi, Hiroshima |
---|---|
Site Area | 27,461㎡ |
Output | 1.7MW |
Work Completion Date | December 2019 |
Power Plant Location | Hitachi-shi, Ibaraki |
---|---|
Site Area | 362,591㎡ |
Output | 16.0MW |
Work Completion Date | December 2019 |
Power Plant Location | Sasebo-shi, Nagasaki |
---|---|
Site Area | 62,604㎡ |
Output | 2.1MW |
Work Completion Date | December 2019 |
Power Plant Location | Omura-shi, Nagasaki |
---|---|
Site Area | 25,828㎡ |
Output | 1.9MW |
Work Completion Date | January 2020 |
Power Plant Location | Omura-shi, Nagasaki |
---|---|
Site Area | 24,149㎡ |
Output | 1.3MW |
Work Completion Date | January 2020 |
Power Plant Location | Kimitsu-shi, Chiba |
---|---|
Site Area | 506,116㎡ |
Output | 36.1MW |
Work Completion Date | March 2020 |
Power Plant Location | Chosei-gun, Chiba |
---|---|
Site Area | 432,776㎡ |
Output | 24.0MW |
Work Completion Date | July 2020 |
Power Plant Location | Usa-shi, Oita |
---|---|
Site Area | 235,929㎡ |
Output | 10.5MW |
Work Completion Date | April 2021 |
Power Plant Location | Kimitsu-shi, Chiba |
---|---|
Site Area | 27,481㎡ |
Output | 1.1MW |
Work Completion Date | January 2023 |
Power Plant Location | Kimitsu-shi, Chiba |
---|---|
Site Area | 27,642㎡ |
Output | 1.5MW |
Work Completion Date | March 2023 |
Power Plant Location | Sodegaura-shi, Chiba |
---|---|
Site Area | 69,995㎡ |
Output | 2.2MW |
Work Completion Date | Scheduled for September 2024 |
Power Plant Location | Wajima-shi, Ishikawa |
---|---|
Site Area | 7,448㎡ |
Output | 7.5MW |
Work Completion Date | Scheduled for June 2025 |
Power Plant Location | Hakui-gun, Ishikawa |
---|---|
Site Area | 65,492㎡ |
Output | 7.5MW |
Work Completion Date | Scheduled for June 2025 |
Power Plant Location | Hakui-gun, Ishikawa |
---|---|
Site Area | 40,111㎡ |
Output | 7.5MW |
Work Completion Date | Scheduled for June 2025 |
Power Plant Location | Nougata-shi, Fukuoka |
---|---|
Site Area | 48,949㎡ |
Output | 2.0MW |
Work Completion Date | September 2013 |
Power Plant Location | Minamishimabara-shi, Nagasaki |
---|---|
Site Area | 28,521㎡ |
Output | 1.1MW |
Work Completion Date | August 2014 |
Power Plant Location | Kuma-gun, Kumamoto |
---|---|
Site Area | 42,281㎡ |
Output | 2.2MW |
Work Completion Date | February 2015 |
Power Plant Location | Ibusuki-shi, Kagoshima |
---|---|
Site Area | 21,830㎡ |
Output | 1.3MW |
Work Completion Date | March 2015 |
Power Plant Location | Ibusuki-shi, Kagoshima |
---|---|
Site Area | 24,178㎡ |
Output | 1.2MW |
Work Completion Date | March 2015 |
Power Plant Location | Ibusuki-shi, Kagoshima |
---|---|
Site Area | 13,893㎡ |
Output | 0.9MW |
Work Completion Date | March 2015 |
Power Plant Location | Ashikita-gun, Kumamoto |
---|---|
Site Area | 34,482㎡ |
Output | 1.5MW |
Work Completion Date | March 2015 |
Power Plant Location | Nasu-gun, Tochigi |
---|---|
Site Area | 9,778㎡ |
Output | 0.9MW |
Work Completion Date | March 2015 |
Power Plant Location | Nasu-gun, Tochigi |
---|---|
Site Area | 40,683㎡ |
Output | 1.2MW |
Work Completion Date | March 2015 |
Power Plant Location | Nasu-gun, Tochigi |
---|---|
Site Area | 39,496㎡ |
Output | 2.4MW |
Work Completion Date | April 2015 |
Power Plant Location | Hokuto-shi, Yamanashi |
---|---|
Site Area | 17,832㎡ |
Output | 0.8MW |
Work Completion Date | June 2015 |
Power Plant Location | Kounosu-shi, Saitama |
---|---|
Site Area | 21,213㎡ |
Output | 1.9MW |
Work Completion Date | August 2015 |
Power Plant Location | Toyama-shi, Toyama |
---|---|
Site Area | 7,421㎡ |
Output | 0.5MW |
Work Completion Date | August 2015 |
Power Plant Location | Shibata-shi, Niigata |
---|---|
Site Area | 21,343㎡ |
Output | 1.3MW |
Work Completion Date | August 2015 |
Power Plant Location | Kaho-gun, Fukuoka |
---|---|
Site Area | 37,290㎡ |
Output | 2.0MW |
Work Completion Date | September 2015 |
Power Plant Location | Kaho-gun, Fukuoka |
---|---|
Site Area | 27,540㎡ |
Output | 2.0MW |
Work Completion Date | September 2015 |
Power Plant Location | Hitachiota-shi, Ibaraki |
---|---|
Site Area | 9,768㎡ |
Output | 0.5MW |
Work Completion Date | September 2015 |
Power Plant Location | Tateyama-shi, Chiba |
---|---|
Site Area | 7,483㎡ |
Output | 0.5MW |
Work Completion Date | November 2015 |
Power Plant Location | Takahagi-shi, Ibaraki |
---|---|
Site Area | 38,119㎡ |
Output | 1.8MW |
Work Completion Date | December 2015 |
Power Plant Location | Takahagi-shi, Ibaraki |
---|---|
Site Area | 43,336㎡ |
Output | 2.3MW |
Work Completion Date | December 2015 |
Power Plant Location | Kisarazu-shi, Chiba |
---|---|
Site Area | 15,780㎡ |
Output | 0.5MW |
Work Completion Date | December 2015 |
Power Plant Location | Tsugaru-shi, Aomori |
---|---|
Site Area | 62,049㎡ |
Output | 2.4MW |
Work Completion Date | December 2015 |
Power Plant Location | Kumage-gun, Yamaguchi |
---|---|
Site Area | 14,425㎡ |
Output | 1.0MW |
Work Completion Date | March 2016 |
Power Plant Location | Tsuyama-shi, Okayama |
---|---|
Site Area | 2,774㎡ |
Output | 0.3MW |
Work Completion Date | March 2016 |
Power Plant Location | Kasumi-shi, Ibaraki |
---|---|
Site Area | 2,553㎡ |
Output | 0.2MW |
Work Completion Date | March 2016 |
Power Plant Location | Kosai-shi, Shizuoka |
---|---|
Site Area | 44,290㎡ |
Output | 2.4MW |
Work Completion Date | March 2016 |
Power Plant Location | Kosai-shi, Shizuoka |
---|---|
Site Area | 20,005㎡ |
Output | 1.2MW |
Work Completion Date | March 2016 |
Power Plant Location | Honjo-shi, Saitama |
---|---|
Site Area | 12,156㎡ |
Output | 0.8MW |
Work Completion Date | March 2016 |
Power Plant Location | Tochigi-shi, Tochigi |
---|---|
Site Area | 49,500㎡ |
Output | 2.6MW |
Work Completion Date | March 2016 |
Power Plant Location | Iwase-gun, Fukushima |
---|---|
Site Area | 132,356㎡ |
Output | 2.3MW |
Work Completion Date | August 2016 |
Power Plant Location | Kashima-shi, Ibaraki |
---|---|
Site Area | 26,449㎡ |
Output | 2.0MW |
Work Completion Date | September 2016 |
Power Plant Location | Namegata-shi, Ibaraki |
---|---|
Site Area | 54,618㎡ |
Output | 2.4MW |
Work Completion Date | September 2016 |
Power Plant Location | Takahagi-shi, Ibaraki |
---|---|
Site Area | 14,874㎡ |
Output | 0.6MW |
Work Completion Date | September 2016 |
Power Plant Location | Akumi-gun, Yamagata |
---|---|
Site Area | 40,547㎡ |
Output | 2.2MW |
Work Completion Date | September 2016 |
Power Plant Location | Kitasouma-gun, Ibaraki |
---|---|
Site Area | 37,611㎡ |
Output | 1.8MW |
Work Completion Date | November 2016 |
Power Plant Location | Kitasouma-gun, Ibaraki |
---|---|
Site Area | 42,032㎡ |
Output | 1.8MW |
Work Completion Date | November 2016 |
Power Plant Location | Himeji-shi, Hyogo |
---|---|
Site Area | 30,743㎡ |
Output | 2.8MW |
Work Completion Date | December 2016 |
Power Plant Location | Sammu-shi, Chiba |
---|---|
Site Area | 43,414㎡ |
Output | 2.0MW |
Work Completion Date | December 2016 |
Power Plant Location | Hakui-gun, Ishikawa |
---|---|
Site Area | 264,924㎡ |
Output | 16.1MW |
Work Completion Date | February 2017 |
Power Plant Location | Oita-shi, Oita |
---|---|
Site Area | 81,194㎡ |
Output | 1.4MW |
Work Completion Date | March 2017 |
Power Plant Location | Saihaku-gun, Tottori |
---|---|
Site Area | 10,903㎡ |
Output | 0.5MW |
Work Completion Date | March 2017 |
Power Plant Location | Toyooka-shi, Hyogo |
---|---|
Site Area | 76,430㎡ |
Output | 2.6MW |
Work Completion Date | March 2017 |
Power Plant Location | Takahagi-shi, Ibaraki |
---|---|
Site Area | 47,158㎡ |
Output | 2.4MW |
Work Completion Date | March 2017 |
Power Plant Location | Namegata-shi, Ibaraki |
---|---|
Site Area | 36,684㎡ |
Output | 2.8MW |
Work Completion Date | March 2017 |
Power Plant Location | Hokota-shi, Ibaraki |
---|---|
Site Area | 12,955㎡ |
Output | 1.2MW |
Work Completion Date | March 2017 |
Power Plant Location | Namegata-shi, Ibaraki |
---|---|
Site Area | 29,539㎡ |
Output | 2.1MW |
Work Completion Date | March 2017 |
Power Plant Location | Nishio-shi, Aichi |
---|---|
Site Area | 8,024㎡ |
Output | 0.8MW |
Work Completion Date | March 2017 |
Power Plant Location | Shiojiri-shi, Nagano |
---|---|
Site Area | 7,084㎡ |
Output | 0.7MW |
Work Completion Date | March 2017 |
Power Plant Location | Kami-gun, Miyagi |
---|---|
Site Area | 18,501㎡ |
Output | 1.2MW |
Work Completion Date | March 2017 |
Power Plant Location | Tsu-shi, Mie |
---|---|
Site Area | 36,679㎡ |
Output | 2.5MW |
Work Completion Date | February 2018 |
Power Plant Location | Chita-gun, Aichi |
---|---|
Site Area | 16,664㎡ |
Output | 0.8MW |
Work Completion Date | February 2018 |
Power Plant Location | Koriyama-shi, Fukushima |
---|---|
Site Area | 41,853㎡ |
Output | 1.5MW |
Work Completion Date | February 2018 |
Power Plant Location | Hokota-shi, Ibaraki |
---|---|
Site Area | 33,998㎡ |
Output | 2.4MW |
Work Completion Date | March 2018 |
Power Plant Location | Shiojiri-shi, Nagano |
---|---|
Site Area | 58,431㎡ |
Output | 2.2MW |
Work Completion Date | March 2018 |
Power Plant Location | Shimonoseki-shi, Yamaguchi |
---|---|
Site Area | 61,815㎡ |
Output | 3.0MW |
Work Completion Date | March 2018 |
Power Plant Location | Shimonoseki-shi, Yamaguchi |
---|---|
Site Area | 24,755㎡ |
Output | 1.2MW |
Work Completion Date | March 2018 |
Power Plant Location | Sammu-shi, Chiba |
---|---|
Site Area | 45,142㎡ |
Output | 1.1MW |
Work Completion Date | August 2018 |
Power Plant Location | Okayama-shi, Okayama |
---|---|
Site Area | 19,387㎡ |
Output | 1.1MW |
Work Completion Date | September 2018 |
Power Plant Location | Kuji-gun, Ibaraki |
---|---|
Site Area | 44,057㎡ |
Output | 1.5MW |
Work Completion Date | November 2018 |
Power Plant Location | Saru-gun, Hokkaido |
---|---|
Site Area | 46,000㎡ |
Output | 2.7MW |
Work Completion Date | January 2019 |
Power Plant Location | Higashimuro-gun, Wakayama |
---|---|
Site Area | 33,825㎡ |
Output | 2.7MW |
Work Completion Date | March 2019 |
Power Plant Location | Aso-shi, Kumamoto |
---|---|
Site Area | 24,766㎡ |
Output | 1.2MW |
Work Completion Date | March 2019 |
Power Plant Location | Toyooka-shi, Hyogo |
---|---|
Site Area | 21,268㎡ |
Output | 1.5MW |
Work Completion Date | May 2019 |
Power Plant Location | Ichinoseki-shi, Iwate |
---|---|
Site Area | 307,212㎡ |
Output | 12.0MW |
Work Completion Date | August 2019 |
Power Plant Location | Nara-shi, Nara |
---|---|
Site Area | 47,969㎡ |
Output | 3.0MW |
Work Completion Date | September 2019 |
Power Plant Location | Nara-shi, Nara |
---|---|
Site Area | 16,404㎡ |
Output | 1.1MW |
Work Completion Date | October 2019 |
Power Plant Location | Akitakata-shi, Hiroshima |
---|---|
Site Area | 27,461㎡ |
Output | 1.7MW |
Work Completion Date | December 2019 |
Power Plant Location | Hitachi-shi, Ibaraki |
---|---|
Site Area | 362,591㎡ |
Output | 16.0MW |
Work Completion Date | December 2019 |
Power Plant Location | Sasebo-shi, Nagasaki |
---|---|
Site Area | 62,604㎡ |
Output | 2.1MW |
Work Completion Date | December 2019 |
Power Plant Location | Omura-shi, Nagasaki |
---|---|
Site Area | 25,828㎡ |
Output | 1.9MW |
Work Completion Date | January 2020 |
Power Plant Location | Omura-shi, Nagasaki |
---|---|
Site Area | 24,149㎡ |
Output | 1.3MW |
Work Completion Date | January 2020 |
Power Plant Location | Kimitsu-shi, Chiba |
---|---|
Site Area | 506,116㎡ |
Output | 36.1MW |
Work Completion Date | March 2020 |
Power Plant Location | Chosei-gun, Chiba |
---|---|
Site Area | 432,776㎡ |
Output | 24.0MW |
Work Completion Date | July 2020 |
Power Plant Location | Usa-shi, Oita |
---|---|
Site Area | 235,929㎡ |
Output | 10.5MW |
Work Completion Date | April 2021 |
Power Plant Location | Kimitsu-shi, Chiba |
---|---|
Site Area | 27,481㎡ |
Output | 1.1MW |
Work Completion Date | January 2023 |
Power Plant Location | Kimitsu-shi, Chiba |
---|---|
Site Area | 27,642㎡ |
Output | 1.5MW |
Work Completion Date | March 2023 |
Power Plant Location | Sodegaura-shi, Chiba |
---|---|
Site Area | 69,995㎡ |
Output | 2.2MW |
Work Completion Date | Scheduled for September 2024 |
Power Plant Location | Wajima-shi, Ishikawa |
---|---|
Site Area | 7,448㎡ |
Output | 7.5MW |
Work Completion Date | Scheduled for June 2025 |
Power Plant Location | Hakui-gun, Ishikawa |
---|---|
Site Area | 65,492㎡ |
Output | 7.5MW |
Work Completion Date | Scheduled for June 2025 |
Power Plant Location | Hakui-gun, Ishikawa |
---|---|
Site Area | 40,111㎡ |
Output | 7.5MW |
Work Completion Date | Scheduled for June 2025 |